This wall has appeared in previous photos as naked studs, but in the last few days I finished the plumbing and electrical work and was able to cover them at last. The wall surface is mostly tongue & groove boards laid horizontally, except for a section of drywall at the top. The boards will form the backsplash area behind the sink and the back of the wall cabinets. I just have a small section to the right of the base cabinet left to close up with beadboard wainscoating and this will be done.
Monday, April 20, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment